As with much of Edmonton’s storm systems, the development of Keswick required a system to drain surface water and prevent flooding. This required more than 500 meters of careful horizontal directional drilling (HDD) that dropped 32 meters to the river bank and a pipe large enough and reliable enough to handle the volume with the inherent flexibility to accommodate a compound bend during the pull. Thankfully, Fusible Brute™ PVC pipe from IPEX was up to the task.
View Case Study